B&O was operating a holiday schedule with the Georgetown switcher working the whole branch. Note the refueling operations for the switcher at that time. Up until ~1944 the Georgetown switcher was steam powered.
Description: B&O was operating a holiday schedule with the Georgetown switcher working the whole branch. Note the refueling operations for the switcher at that time. Up until ~1944 the Georgetown switcher was steam powered.