MP 9.8: Bridges 22 & 23

MP 9.8: B&O Bridges #22 & #23. Both poured concrete, they provide for drainage from the C&O Canal above. Here is the top of #23; they had to build a wall right into the stone to prevent the water from spilling over onto the r-o-w. It cascades down a waterfall to the channel below.

Comments

Add a comment

No comments yet. Be the first to comment!

  •  

About this photo

Photo info

Popular tags

Download Photo